Vegetable planters – using railway sleepers – foundations done. Under constructionReady for shingle and some tidying up.Almost there!Job done. From start to finish about 10 working days.
CONSERVATORY in Alverstone. These four pictures show the start. Digging out foundations and concreting
Under construction and internal plastering.
Tiled floor and nearly finished…
Completed. This job was half block built and rendered conservatory.
DRIVEWAY before and during construction – using block pavingView from the top to the bottom with some shameless advertising! Completed – view from the road up to the property.
KITCHEN ALTERATIONS and preparation for bi-fold doorsDoors are in – view from the insideOutside view
After plastering all walls, a local company fitted the kitchen, and the owner decorated. TRW Builders project managed the work. Job completed.
Small curved garden wall
Block paving path with a surprise photo bomber! and one using concreteFinished patio looking at the houseLooking at the curved garden wall
Steps and small patio area
Completed look by the owners
CHIMNEY reconstruction, some bricks needed to be removed and replaced, lead try had to be replaced and general tidy up to make safe and usable.